www.howtonetwork.org

CCNA & CCNP Certifcation Training

  • About
  • Contact
  • FAQ
  • Join
  • Home
  • CCNA
    • ICND1
    • ICND2
    • 101 CCNA LABS
  • CCNP
    • ROUTE
    • SWITCH
    • TSHOOT
    • 101 CCNP LABS
  • CompTIA
    • Security+
    • Network+
  • Design
    • CCDA
    • CCDP
You are here: Home / 101 CCNA LABS / Challenge Labs Solutions / Challenge Lab 3 Solution: EIGRP, PAT, ACLs and Banners

Challenge Lab 3 Solution: EIGRP, PAT, ACLs and Banners

Task 1 Hints & References

For reference information on configuring hostnames, please refer to:

Lab 21 Configuration and Verification Task 1

Lab 35 Configuration and Verification Task 1

Task 2 Hints & References

To bring up the interfaces, you need to perform a no shutdown command on the interface.

For reference information on configuring and verifying VLANs, please refer to:

Lab 1 Configuration and Verification Task 3

Lab 2 Configuration and Verification Task 3

Task 3 Hints & References

Each router must have two Frame Relay map statements similar to the following:

Serial1/0 (up): ip [IP ADDRESS] dlci [DLCI . . .

The content below this message is for members only.

About Us

This is a free bonus site for members of www.howtonetwork.com

Copyright

The content on this copyright Reality Press Ltd.
Copyright Reality Press Ltd.