Task 1:
For reference information on configuring hostnames, please refer to:
Lab 35 Configuration and Verification Task 1
Task 2:
For reference information on configuring and verifying VLANs, please refer to:
Lab 1 Configuration and Verification Task 3
Lab 2 Configuration and Verification Task 3
Task 3:
For reference information on configuring DCE clocking, please refer to:
Lab 21 Configuration and Verification Task 2
Lab 35 Configuration and Verification Task 2
For reference information on configuring Loopback interfaces, please refer to:
Lab 39 Configuration and Verification Task 4
Lab 43 Configuration and Verification Task 2
Task 4:
For reference information . . .
The content below this message is for members only.