| Lab Objective:
The objective of this lab is to cover all relevant CCNP ROUTE and SWITCH theory. These labs will include topics from each of these guides. It should be noted that not all topics will be included in all labs. Additionally, not all solutions will be illustrated in detail. You can refer to previous labs for assistance with some basic configurations. Lab Topology: The lab network topology is illustrated below:
Task 1 Configure hostnames, IP addressing on all routers as illustrated in the network topology. Task 2 Configure VTP on DLS1 and DLS2 so that DLS2 automatically receives VLAN information from DLS1. Both switches should reside in domain 2011. Secure VTP messages with a password of CCNP2011. Configure an SVI in VLAN 100 for DLS2. Assign this SVI the IP address 150.1.1.253/24. Verify your configuration using the appropriate commands. Also, verify that all devices on the 150.1.1.0/24 subnet can ping each other. Task 3 Configure switches DLS1 and DLS2 to use the 802.1w and 802.1t standards. In addition to this, configure the switches to use 32 bit based values for default port path costs Verify the solution and configuration using the appropriate commands. Task 4 In the future, Cisco IP phones will be connected to ports Fa0/1 to Fa0/5 on switches DLS1 and DSL2. Implement QoS so that markings sent by Cisco phones are trusted. In addition to this, configure QoS so that all user data received on these ports is assigned a CoS value of 2. Verify your configuration using the appropriate commands. Task 5 In the future, non-Cisco IP phones will be connected to ports Fa0/1 to Fa0/5 on switch ALS2. Implement QoS so that the switch rewrites the CoS value for all incoming frames to a configured default value of 1, regardless of any existing CoS value. Verify your configuration using the appropriate commands.
Task 6 Configure OSPF on all routers as illustrated in the topology. You must adhere to the following guidelines and restrictions when implementing OSPF:
Your solution should take into account a possible R1-R3 or R2-R3 link failure. Routing should work in the event that either one of these links fails. Verify your solution by checking the routing tables of all devices. Next, test your solution by disabling the R1-R3 link and verifying that you can ping from R4 to DLS2. Finally, test your solution by disabling the R2-R3 link and verifying that you can ping from R4 to R2s LAN interface. Task 7 Authenticate the OSPF backbone using the plaintext password CCNP2011. Verify your configuration using the appropriate commands. Task 8 IP version 6 needs to be integrated into the network. Enable RIPng between switches DLS1 and DSL2 as well as router R1. Use the 3ffe:abcd:1111:1/64 subnet. Verify your configuration. Task 9 Configure ISATAP tunnels on all routers. Use Loopback interfaces as the tunnel source. These Loopback interfaces should use the router number; for example, the Loopback interface on R1 should be assigned IP address 1.1.1.1/32, the Loopback interface on R2 should be assigned IP address 2.2.2.2/32, etc. The tunnels should be configured using the fec0:abcd:1234:1::/64 subnet. Verify your configuration using the appropriate commands. Task 10 Configure the following IP version 6 (IPv6) LAN subnets on the following routers:
Next, configure MP-BGP on all routers. All routers should use their ISATAP tunnel addresses for peering. Ensure that all routers advertise their LAN subnet via MP-BGP. MP-BGP peering should be configured on all routers as follows:
Verify your MP-BGP configuration using the appropriate commands. Task 11 Configure the following IPv6 subnets on routers R2, R3, and R4. These should be advertised via MP-BGP. The subnet allocations are as follows:
Verify your configuration using the appropriate commands. Finally, complete this task by also ensuring that all IPv6 subnets can ping each other. You do not need to be able to ping the switches from the subnets connected to R2, R3, or R4 when completing this task verification. |