Lab Objective:
The objective of this lab is to cover all relevant CCNP ROUTE and SWITCH theory. These labs will include topics from each of these guides. It should be noted that not all topics will be included in all labs. Additionally, not all solutions will be illustrated in detail. You can refer to previous labs for assistance with some basic configurations.
Lab Topology:
The lab network topology is illustrated below:
|
IMPORTANT NOTE If you are using the www.howtonetwork.net racks, please implement the following pre-lab configurations. This is required because of the manner in which the routers and switches are physically cabled to each other. The following configuration should be applied to switch ALS1:
If you are using the www.howtonetwork.net racks, please bring up the LAN interface connected to R2 by the following configuration:
Alternatively, you can simply connect the interface to a hub or one of the switches and bring up the interface in the standard manner. |
Task 1
Configure hostnames, IP addressing on all routers as illustrated in the network topology.
Task 2
Configure an EtherChannel between DLS1 and DLS2. This should be a Layer 2 trunk link that is unconditionally bonded. Configure an SVI with the IP address 150.1.1.253/24 on DLS2. Verify that all devices on the 150.1.1.0/24 subnet can ping each other.
Task 3
Configure OSPF using process ID 1 on R1, DLS1 and DLS2. Ensure that no DR/BDR election will occur on the 150.1.1.0/24 subnet. All devices should peer with each other. Verify your configuration using the appropriate commands.
Task 4
Configure OSPF using process ID 2 between R1 and R2. Ensure that no OSPF Hellos are sent out the LAN interface of R2. Verify your configuration using the appropriate commands.
Task 5
Configure OSPF using process ID 3 between R1, R2 and R3. Do NOT enable OSPF on the LAN interface of R3. Verify your configuration using the appropriate commands.
Task 6
Configure EIGRP using AS 4 between R3 and R4. No EIGRP Hello packets should be sent out of the LAN interfaces of R3 or R4. R4 should be configured as a stub router. This router should advertise only connected subnets. R3 should advertise only a default route to R4. Verify EIGRP routing configuration using the appropriate commands.
Task 7
Redistribute between the OSPF processes on R1 and R2. Ensure that routes from one process will never be redistributed back into the same process. You are NOT allowed to modify the default administrative distance when completing this task. When completing this task, ensure that the cost of the routes to reflect the entire path. Verify your configuration using the appropriate commands on all routers and ensure that there are no routing loops when done.
Task 8
Configure one-way redistribution of EIGRP into OSPF on R3. Ensure that only a single prefix is advertised to the OSPF domain for the 10.3.3.0/24 and 10.4.4.0/24 subnets. The 150.0.0.12/30 subnet connecting R3 to R4 should never be advertised to the rest of the OSPF domain. You are NOT allowed to use a distribute list to complete this task. Verify that all other routers are able to reach the R3 and R4 LAN subnets and vice-versa.
Task 9
Management has advised that a new video solution will be implemented in the network. The IP Multicast server will reside on R1s LAN and clients will reside on R4s LAN. Configure PIM Dense Mode and assign R1s LAN interface to the 227.1.1.1 group and verify that you can ping this from R4s LAN interface. This should work even if the R1-R3 or the R2-R3 link is down.