Aspects of Business Continuity

One of the goals of a well-planned infrastructure is to maximize the availability of network services. There are a number of concepts that can be applied to infrastructure planning to ensure business continuity and high availability, even in the face of unplanned incidents. This section will cover the following topics:

 

  • Business impact analysis
  • Removing single points of failure
  • Business continuity planning and testing
  • Continuity of operations
  • Disaster recovery
  • IT contingency planning
  • Succession planning

 

Business Impact Analysis

Resources should be put toward mitigating losses with the greatest bang for the buck. This is done through business impact analysis. The loss from an interruption of service is not calculated on the cost to provide the service, but rather on the loss of the benefit a service usually provides. For example, the cost of the loss of a relatively inexpensive server running inexpensive software should not be measured in replacement cost, but in the loss of value from a server being unavailable. When allocating resources to minimize the business impact of any given outage, you should ask, “What happens if we lose a certain service, or a certain piece of hardware?”

 

A plan to keep the business going should consider the natural or technical disasters that can cause outages, and how these incidents affect the business. An administrator should create IT contingency planning recovery point objectives with the business in mind. A recovery point objective (RPO) is the maximum period of data that could be lost due to an outage. It may be absolutely necessary to keep a database with mirrored transactions fully synced at all times, so that absolutely no data is ever at risk, or it may be that certain data only needs to be protected on a daily, or even weekly, basis. The recovery point should be set according to business needs.

 

The length of time any particular outage renders services unavailable is known as the recovery time. The goal made for restoring service after an outage is known as the recovery time objective (RTO). If a server loses a power supply, is a plan in place to restore service immediately, or is it permissible to leave the server unavailable while parts are shipped? The RTOs should likewise be set according to business needs.

 

After conducting a business impact analysis, a plan should be crafted that satisfies the RPOs and the RTOs. These plans can range from a simple offsite backup to a fully redundant online offsite data center.

 

Removing Single Points of Failure

One of the most basic ways of increasing uptime is by removing single points of failure. Will a critical service experience downtime when a single piece of hardware (such as a single disk drive, a single server, a single rack, or a single site) has an issue? The more critical service availability is, the more important it is to build redundancy into the infrastructure design.

 

This may mean multiple power supplies, uninterruptible power supplies, RAID arrays, redundant service providers (such as power or Internet), or multiple locations from which a service can be provided.

 

Business Continuity Planning and Testing

After establishing RPOs and RTOs, it is a good idea to review and test your recovery plan to ensure that it actually functions. Without business continuity planning and testing, you risk a situation such as a RTO plan that relies on a restore from backup that completely fails in the case of a disaster, damaging both the original data and the drive necessary to read the backup media.

 

“Wargaming” various scenarios will help to ensure that your plans are actionable in the case of a disaster. Testing restores not only will ensure that your data protection is functioning as desired, but also will better prepare the system’s team to respond in the case of an actual disaster recovery. Regular testing ensures that business continuity planning will actually lead to the continuing provision of service, even in the face of a disaster that might otherwise have had a catastrophic business impact.

 

Continuity of Operations

When disasters happen, it is important to ensure your business can still function. This is known as continuity of operations. Some services that are normally provided by means of technical infrastructure can also be provided by other means. The provision of non-technical means to provide critical services can provide a strong “worst-case scenario” fallback position. For instance, a computerized catalog might normally provide a quick way to learn the necessary parts and service for a car dealership. If the dealership were to experience a computer outage, but had hard copies of the necessary service manuals on hand, work could continue under less-than-ideal circumstances rather than grinding to a halt.

 

Though the risk of outage cannot be totally eliminated, it can be appreciably reduced though business continuity planning and testing. Even in cases of technical outage, businesses may be able to prepare non-technical means of continuing operations.

 

The best metric for determining the effectiveness of a continuity of operations plan or a disaster recovery plan is the mean time to restore. In cases where even a complete, catastrophic loss of a site does not impact the provision of services, the mean time to restore approaches zero. The sooner you can restore full functionality after a disaster or technical failure, the better.

 

Disaster Recovery

When it comes time to perform disaster recovery, a plan should already be in place and tested. The disaster recovery process is simply the application of the already established disaster recovery plan to meet the RPOs and RTOs. The first time you are restoring data from backups made as part of your disaster recovery plan should not be in the midst of an actual disaster. A well-tested plan should leave no surprises. This will be discussed later in the chapter.

 

IT Contingency Planning

Part of a disaster recovery or business continuity plan should be IT contingency planning, which is basically the practice of planning that failures happen a little at a time, if at all. This can include redundant systems for the most critical services, strong non-technical fallback positions for some services (such as service manuals in place of an online parts database), or alternative sites that may be brought online temporarily. It is closely related to business continuity planning; however, it is only concerned with the delivery of services.

 

Succession Planning

In any organization, there are a number of indispensable roles. A good succession plan ensures that no role exists in which only one person can fulfill it. There may be any number of reasons a certain individual can no longer perform his or her assigned role, such as a sudden departure or incapacity. To minimize the disruption caused when a certain role changes hands, encourage key personnel to train others in the performance of their key duties. Another tactic to minimize disruption caused when roles change is to encourage regular job rotation where practical.