www.howtonetwork.org

CCNA & CCNP Certifcation Training

  • About
  • Contact
  • FAQ
  • Join
  • Home
  • CCNA
    • ICND1
    • ICND2
    • 101 CCNA LABS
  • CCNP
    • ROUTE
    • SWITCH
    • TSHOOT
    • 101 CCNP LABS
  • CompTIA
    • Security+
    • Network+
  • Design
    • CCDA
    • CCDP
You are here: Home / ICND1 / Day 20 – Review 5 / Day 20 Lab – Static Routes

Day 20 Lab – Static Routes

Topology

 

Instructions
Connect three routers together with Serial or Ethernet connections:

  1. Configure the connections between the routers and ping
  2. Add Loopback addresses to the two spoke routers, as per the diagram
  3. Add a static route exit interface on the hub router for the 10.1.1.0/20 subnet
  4. Add a next-hop address for network 172.16.1.0/30
  5. Ping . . .

    The content below this message is for members only.

About Us

This is a free bonus site for members of www.howtonetwork.com

Copyright

The content on this copyright Reality Press Ltd.
Copyright Reality Press Ltd.